Showing posts with label On Ringo Lake. Show all posts
Showing posts with label On Ringo Lake. Show all posts

Wednesday, February 28, 2018

February OMG Update

I am so excited to have two almost-finishes to report as this short month comes to a close!  I was actually able to exceed my own expectations with my On Ring Lake quilt - not only did I finish piecing the top, but I quilted it and attached the binding (I still have to sew it down - not my favorite part of quilting). It is such a huge relief to have all of those pieces and parts out of my sewing room, and I absolutely love how it turned out!



I also managed to make great progress on my Floral No. 7 rug. I finished hooking it just in time to take it with me to the Lenexa hook-in to bind. I am only about half way done with the binding but I couldn't resist posting it now - it will be completely finished soon!



I'm linking up with Elm Street Quilts One Monthly Goal again this month.  I'm really struggling with which project to choose for March - I don't want to break my streak! More on that later this week....

Thursday, February 1, 2018

Wrapping Up & Planning Ahead

In stark contrast to my last post where I claimed victory on my January OMG project, I have to report a complete fail for pretty much everything else. I really tried to work on my Patchwork Times UFO, my tumbers....but they are SO boring!  It takes me way too long to choose the pieces in an effort to avoid repetition, and then every single time I add a row I find that I have somehow randomly managed to line up the same fabrics in multiple spots. I did manage to assemble a couple of rows and add one row to the section I am currently working on but it is still far from finished.

I didn't even touch my APQ UFO.  Okay, that's not quite true - I picked up the baggie with all of the pieces for one of the last two blocks and decided it didn't look at all fun to work on so it went back into the UFO pile.  

And while I had lots of ideas and good intentions to start one of my new projects for my 6 & 6 in 2018, I somehow never managed to get any of them going. I am going to bend the rules a little and start one this weekend...just a little late.

I'm pretty sure the reason behind my lack of success in January is the state of my sewing room.  It currently looks like On Ringo Lake exploded in there. Every horizontal surface (and one vertical one) is covered in pieces and parts of that quilt.


I have assembled one corner and quite a few of the blocks, including another 10 or so that aren't on the design wall yet, but I have a long way to go on it! Luckily it is this month's Patchwork Times UFO and I am selecting it as my OMG project for the month as I really need to reclaim my sewing room.


My other distraction in January was my clamshell project. I would love to have it finished before Irene comes back this fall - a real stretch, I know.  I have been prepping the clams with starch and sewing them into sections of ten rows of six. I recently went back to prepping them by basting like Irene taught in her class.  It's not quite as fast for me but it is certainly more portable! 







This is my third panel of 60 clams.  It isn't completely assembled yet and I can see one that needs to be moved now that I look at the picture...


I laid out the three panels side by side and decided that I need three more clams across to get the size I need, so I will have to make one panel of 3x10 and then will do the rest 7x10.  I am not sure how many rows of panels I will need - I will do that math later to keep myself from getting too discouraged!

So much for my non-progress report for January. Linking up with Elmstreet Quilts One Monthly Goal and 6 & 6 in 2018 - hopefully I will do better at sticking with my plans this month!

Monday, January 8, 2018

Mystery Quilt Update

While I am not nearly as far along as many other participants, I did finally manage to finish all of the half chevrons this weekend.  I nearly have all the pieces and parts assembled now.  I did end up having to add a couple of other fat quarters of tan into the mix due to all my cutting blunders early on. Hopefully I will come up with a project for all the mis-cut 2" tan squares somewhere down the line!


I was able to get a couple more blocks together so I could get a look at how it will all come together.  I made four blocks but realized I turned the corners the wrong way on one of them so it will have to be corrected.  It makes a really nice looking block that way too!  I had a lot of trouble getting the chevrons going the right direction just in this little bit I layed out so I now completely understand what people have been posting about it being really challenging to keep everything straight. I really love how the colors turned out.


I spent a little time doing some Slow Sunday Stitching on my clamshells last night.  I am half way through sewing the last rown on this panel - only a couple of clams left to go and then I can move on to the next one. I have been trying to use my "Lap App" when I work on this one. I know that everyone loves them but I am still not sold on it....


Head over to Kathy's blog to see how others spent their first Slow Stitching Sunday of 2018 and to the final Mystery Monday Link-Up on Bonnie's blog to see all the fantastic progress and fabulous variations of On Ringo Lake. There are some incredibly creative quilters in the mix - some of the alternate settings and colors make me want to do this one again! 

Tuesday, January 2, 2018

2018 UFO List

On Ringo Lake was revealed today and I love it!  I would prefer the quilt to be a bit larger, at least as far as the width is concerned, but I think borders would end up making it too long.  I’m considering adding two more columns to make it square but really don’t like the idea of having to do all the additional piecing. I will have to give that idea some thought.  I love how my colors came together and think I am going to be very happy with the finished quilt!


As the year came to an end I took a look back at my 2017 UFO list and while it was my best year yet as far as finishes were concerned, it always amazes me how an entire year can go by without even touching a project that was of interest in January!  I was a little easier on myself last year, choosing several projects that were very near completion.  I really don't have any of those to list this year, so I decided I would take a slightly different approach and instead choose projects that already have considerable time put into them but need serious focus to get them closer to the finish line.  I am pretty sure that most of these will still be incomplete at the end of this year, but my goal is to spend at least some time on them no matter what other shiny objects capture my attention during the year.  The first is Kansas Memories (Primitive Gatherings design).  This one isn't on my quilt project list for some reason - either I forgot to add it or it was started prior to 2007 (which is a definite possibility!).  This one has been waiting for the applique to be completed for a very long time. The vine and a few leaves and berries have been basted in place but I have not done any of the stitching. I think there are over 400 leaves to be added to this one!


And then there is my Spools quilt that I started in a workshop with Edyta at Paducah in 2015 and used strips from a guild exchange to complete. I haven't done anything with the borders on this one yet and if memory serves correct there is a LOT of applique needed.


My Feathered Friends wall hanging was started in a workshop with Mary Sorenson at Paducah ten years ago. I am seeing a lot of leaves in my future!


And then there are my tumblers....my "leader and ender" failure from 2016.  I decided that leaders and enders are not for me - I chain piece whenever possible and minimize the "wasted" stitching time anyway, and figuring out which color tumbler to add each time was really slowing me down. 


I rounded out the 12 by leaving a couple of 2017 entries on my list - perhaps 2018 will be the year I am able to move at least one of those across the finish line?

I am already getting sucked into the vortex of new projects for the new year.  There are at least two that are tempting me already - and it's only January 2nd!  One of these years I need to resolve to have some self-control!

Thursday, December 28, 2017

Playing Catch-up (On Ringo Lake Part 5)

With Christmas behind me and a few days of vacation left I have finally made it into the sewing room to try to catch up on my On Ringo Lake project.  I finished the most recent step this morning.


There are a lot of geese on this lake!  I still need to go back and finish the geese from week #2.  So many triangles to cut!  

Once that step was completed I went back to get started on week #4 which unfortunately had been untouched before today due to a bout with a virus that pretty much kept me in bed the entire weekend after that clue was released. Once I recovered I had to kick things into high gear to prepare for Christmas.  One of these days I am going to actually start shopping early! Although there are a lot more triangles in this step it is somehow more entertaining than geese....


I am loving how the colors look together. I can’t wait to see how the blocks come together- I think I’m going to love this quilt!

As the year comes to a close it is time to start thinking about UFOs for 2018,  On Ringo Lake will certainly be on the list.  Triangle Gatherings will be there too.  I’m currently up to block 87 so I have 9 more blocks to make and then need to figure out how I am setting them. It will be nice to get this big stack of blocks off my sewing table!


The third project I’m putting on the list is Starlite Skies.  I really need to get some of the past SBOWs completed as they are really starting to stack up!  I’ve made decent progress on this one this year and think it’s reasonable to think I can get it across the finish line.


Project four will be my clamshells started in the workshop with Irene Blanck last May.  I haven’t gotten very far and can’t realistically expect to complete this one but would like to make significant progress on it.


I’m thinking project 5 will be Duarmont from Primitive Gatherings.  I bought the kit at Paducah last April and prepped one block shortly after returning home but have never stitched it nor prepped any other blocks (there are nine).  I really don’t think these will take all that long to stitch.


I haven’t decided on the rest of the list just yet... I need to give it a little more thought.  There are so, so many to choose from!

I’m hoping tomorrow’s On Ringo Lake step doesn’t involve triangles but realize it’s pretty unlikely I will get my wish.  I have been enjoying catching up with everyone’s posts on Bonnie’s Link-up the past few days.  We are getting so close to the big reveal - I can hardly wait!  

Monday, December 11, 2017

On Ringo Lake - Week #3

I didn't get all that much sewing done this weekend so I have only a small start on clue #3. The mirror image thing always slows me down a bit - especially since I usually have batiks involved and then can't keep track of which side to sew on. I only managed to finish 32 of each, so there will be lots of catching up to do on this step.


I decided to cut the neutral triangles from the mis-cut rectangles from last week. I can get two triangle from each with only about 1/2" of waste so it seemed like the best option for using those. I have used up a lot of my neutrals between cutting extra week #1 and screwing up week #2 so I want to do what I can to not run out before I'm finished.  Of course I am sure I could find more to throw in....

We had Wool Club this Saturday.  I had not been able to go in a long time - March, I think - so it was great to see everyone!  I was able to pick up some more yarn to finish binding my Old Settlement rug. It's the largest rug I have ever finished (not the largest I have started, of course!) at 6 ft long.  


I didn't manage to get completely caught up on the Triangle Gatherings blocks Lisa posted on Saturday, but I finished block 86 and started #87.  I think this one is one of my favorites so far.


Lisa's last post indicated there will be 98 blocks instead of the 90 we all thought.... I still love this project but have to admit I was a little bummed to learn that I am not finished prepping the HSTs with triangle paper.  I thought I was finished with that stuff for a while! 

I'm betting a lot of folks are a lot farther along on their clues than I am.... I'll be checking out Bonnie's link-up throughout the day to see how others are progressing. There are some really fun color combinations out there!

Monday, December 4, 2017

On Ringo Lake Week 2

I couldn't wait to get into the sewing room to get started on clue #2 this weekend! As soon as Saturday morning errands were completed I headed right up and started cutting. I wanted to give the new folded corner ruler a try so I went with sqaures and rectangles rather than cutting triangles. So I pressed, cut, sub-cut and neatly stacked all of my pieces next to my machine and started cutting and sewing. Notice anything wrong with this picture?


I had about six geese sewn before I realized that my SQUARES were supposed to be neutral and my rectangles tan. Needless to say, I wasn't happy. I guess on the bright side I discovered the error early! 

So back to the cutting table to recut everything.  I wasn't able to finish the entire clue but made a solid start. I hope to pop into the sewing room for a few minutes here and there throughout the week to try and finish them off.  Now I have to hope for another clue that requires my mis-cut pieces!  I may need to add more fabric - I am not sure if I will be able to recover from everything I have "wasted" with over-cutting and mis-cutting the first two weeks.


Yet another lousy photo - my old iPhone 5 pictures just can't be enlarged at all in posts. I do plan to get a new phone one of these days.....

Regarding the new ruler - it's not my favorite.  I didn't really care for having to trim as I was sewing.  It really felt like it took more time, I still had to trim a little for some of them, and my trash is overflowing with all of the tiny triangles I cut off (no way I was sewing all of those little things as "bonus triangles"!). I think my preference is still the Essential Triangle tool - all the cutting is done up front with no waste. But you never know if you don't try!

Check out the Mystery Link-up on Bonnie's blog to see what others are doing or get started on your own version - it's not too late! 

Thursday, November 2, 2017

November Already?

This year is definitely flying by!  I was watching The Chew during lunch yesterday and they were preparing Thanksgiving recipes. I'm not ready for the holidays yet!  But I am ready for this year's Quiltville mystery to start - I started thinking about colors even before Bonnie posted the fabric requirements this week. I found the fabric on the left - the batik print - while I was down in Springfield, MO this past weekend taking a class on the new Statler software.  I decided I would use it as my inspiration piece, and now that we have the final size of the quilt (75" x 90") it may end up being a border.  I pulled a few fabrics from my stash last night to play with color options.  I was thinking dark teal, light teal and coral:


The coral looks really orange in this picture - I don't think I like it.  I may need to go with a shade of pink/magenta or possibly gold?  I will try those combos tonight.

This week's big news is that I finally finished my Disappearing Nine Patch!  I started this quilt in 2007 as a block exchange with my bee friends.  It was the first quilt listed on my quilt projects tab when I started blogging back around 2008.  I am very excited to be able to mark it complete!



I also was able to get last year's mystery, En Provence, quilted this week. After my most recent class I was feeling pretty confident about using my machine and decided I would try another feather pattern (I tried one on the very first "real" quilt I quilted and it was a disaster!). I am very happy with how it turned out. I still need to prepare the binding and get it sewn on. I would like to finish this one before the next one starts if at all possible.


I'm heading off to Shipshewana for a retreat and classes with Di Ford next week.  I am really looking forward to learning from Di and am hoping to actually make a little progress on my Starlite Skies BOW outside of class time. This will be my last "fun" trip for the year.  It's time to start planning for 2018!