Tuesday, April 5, 2016

March Quilty 365 Count

I was so busy finally finishing the unpacking of the sewing room over the weekend that I completely missed posting my Quilty 365 update! I was so sick of trying to sew amidst the chaos - not to mention that I needed to finish going through all the boxes to get ready for our guild yard sale in a couple of weeks - so I was determined to keep going until I finished.  It took the entire weekend, but I did it!  Five full boxes plus a few over-sized items priced for the sale and everything else put away.

Here's the "before":






And here's the "after" (not much on the walls yet - I'm still trying to decide if I want to hang some of my Cardinals memorabilia or leave them blank):






My room is still bursting at the seams but at least for the moment is a lot better than it was. It's borderline ridiculous - I have enough fabric to last me the rest of my life. I have decided that I need to exercise a lot of self-control in Paducah this year!

Back to the Quilty 365 update.... I was doing SO well - I was ahead a day or two on my orange peels for most of the month.  And then I had to travel.  Usually I at least get a little sewing done while I travel, on the flights if at no other time. Unfortunately both legs of this trip were not only short but extremely turbulent. I wasn't able to sew on either flight and was tied up in the evenings with long dinners the rest of the time. I did get to enjoy dinner at the top of the Hancock building.Our waiter informed us that we needed to go up to the ladies' restroom and see the view - they claim it's the best restroom view in the US.  Given that most restrooms don't have a view, I wasn't really sure that bar was very high....but it was quite a view!  We took photos to share with the men in the group - apparently there were no windows in the men's room.


We had to go back up after dinner to capture a night shot.


So I ended the month with 26 blocks (yes, one is missing from the photo...but including it really messed with my OCD brain).


March 31 was the 91st day of the challenge, and my total stands at 83 blocks. I'm cheating a little counting the blocks I completed last year, but it gives me hope that I might actually make 365 this year. I'm on track so far for April with 5 blocks completed as of last night. I'm determined to hit the target at least once!

Monday, March 28, 2016

Easter Weekend Progress Report

I had a very busy weekend cooking, running errands and cooking...not to mention judging the family Easter egg coloring contest....but still managed to get a little sewing done. I guess I have to concede that I am officially behind on the 365 challenge now as I was not able to finish last week's blocks, but I managed to get four of them finished,


There are a couple that were assigned later in the week that look incredibly painful.  I'm hoping to get back on track next weekend because if I get too much further behind I will be overwhelmed!

While sewing the 365 blocks I got back to working on my leader-ender tumblers which actually made them more fun.  I finished my third row (57 tumblers) and got started on a fourth.


I have been spending my evenings working on my newest project, a Baltimore album quilt. In what might have been a moment of crazy....under the influence of incredibly inspirational applique at this year's Academy - my friends and I decided to embark on making an album quilt.  One each, not a group effort.  And a complete quilt, not just a few blocks. It has been so much fun so far - we are all comparing notes and progress and keeping each other motivated.  We are still on the first block so we have a long way to go, but I am so excited and inspired by this project!  Here's my first block so far (please excuse the wrinkles!):


I also spent some time prepping more orange peels to be sure I had plenty for my trip.


I had a very turbulent (and thankfully short) flight and have been busy both evenings I've been here so I haven't even opened my little bag.  I'm hoping to get at least a little sewing time tomorrow - I am so close to making my one a day goal this month!

Friday, March 25, 2016

Easter Weekend Sew-In

I'm hoping to wrap up work early today to allow a little time to get started on the Easter Weekend Sew-In. I'm not sure how much time I will be able to spend in the sewing room with family in town, Easter activities and a business trip beginning early Sunday afternoon, but I plan to do my best!  If you would like to sew along with the rest of us (or try to, anyway!) you can sign up on the Sugarlane Designs blog.

Sign up here!
I had a chance to visit the Bits 'n Pieces 2016 Fanfare of Quilts last weekend.  What a fantastic show! I could tell it was going to be a good one from the moment I walked in the door.  



Look at all the beautiful applique! This one was my absolute favorite:


The colors were absolutely beautiful and the applique was spectacular!


Once again I have a bunch of lousy pictures - I think it is time for a new iPhone... This was a very striking quilt (hard to tell in the washed-out photo):


Here are a couple more excellent examples of the appliqued quilts on display:



The show was very inspiring!  One of these days I will have an applique quilt in a show...I have a solid start on about 50 of them. I just have to live long enough!

Thursday, March 17, 2016

365 Challenge Dilemma

I've been plugging along with the blocks for the 365 challenge and have been able to keep up for the most part. I'm not sure why I can't get a decent picture - the colors don't come across correctly on the iPhone - but here is most of my progress since I last posted them.  There are a couple more that I finished after this was taken. 


Here's my dilemma, though - I spend almost all of my machine time trying to keep up with these. Thankfully they are assigned in a level of difficulty progression by technique so there are usually a couple of quick ones in the mix each week, but they still require a lot of time. My interest is starting to wane. But given that I have 72 blocks completed I feel a little trapped!  I could put them all into a small quilt but where's the fun in that?? I was just about ready to cry uncle last week and stop trying but then spread these all out on the floor and felt like I had to keep going. Given I feel this way now I'm not sure I'm going to last 9 more months!

I stopped working on 365 blocks long enough to prep a bunch more orange peels. As of last night I am caught up for this month so far - 16 peels completed by the 16th!

I should know better than to have committed to two blocks per day between these two projects. What was I thinking?!?

Monday, February 29, 2016

February Wrap-up

February was a busy travel month for me!  Applique Academy in Dallas at the beginning, New York for work in the middle, and a quick trip to Kansas City at the end. My daughter and I attended the Lenexa hook-in this past Saturday. I hadn't hooked a single loop since the beginning of December so it felt good to get back to it.

This was the 20th year for the hook-in and the group that works with Marilyn Schmidt to organize it every year had a few surprises in store for her. They set up a surprise display of some of her rugs including the family history one pictured below. I should have grabbed a better picture of the detail - this was just something I snapped when everyone was taking pictures of her posed by it.  It is amazing!


Amazingly enough, I didn't buy a single thing. I was very, very tempted by Anita's braid rug.  She had a couple copies of the pattern with her. She's making quick progress on the one she is hooking and it looks very cool!  We were sitting close to her booth so the pattern was calling my name all day. I was just about to give in to temptation and purchase it when someone else bought the last one. Such a relief! Anita offered to order another one for me but I regained my self control and decided to pass...for now.


All of my travel has been good for my orange peel project!  I managed to finish 22 this month.  Not quite one per day but a strong showing for the month.  


I decided to count my progress so far....I have 57 finished peels. I thought I had a few more than that, but it is definitely progress! I figured out that I need 900 peels to make a queen-sized quilt (97.5" square).  So at a pace of 20 per month we're talking 3.5 more years just to get to the point of assembling the top. Sigh!


Monday, February 8, 2016

TKDAA 2016

This year's TKDAA conference has sadly come to an end and unfortunately it is now time to get back to the real world and work, but I can't resist taking a few minutes to capture some of the incredible inspiration of the past few days.

The weather in Dallas was chilly but sunny most of the time and the view from the Rockwall Hilton was spectacular! The hotel is located on a large lake and there were actually people out boating most days even though temps were in the 40s and low 50s. Crazy!  I much preferred admiring the pretty view while stitching indoors.


I took a Broderie Perse class taught by Cynthia Williford.  Cynthia is an outstanding teacher and shared a lot of great historical information on the fabrics and the technique. I have to admit that I still struggle a bit with the technique myself - it is hard for my OCD brain to cut into some images on the fabric when cutting out others and I absolutely have to follow along the line of the image to turn under the background. No smoothing edges or leaving the original background for me! It can make the process very tedious. Nonetheless, I played along and got this far with mine:



It's tough to tell from this photo, but the left side is mostly stitched (down to the pink bud and blue/pink flower near the center). Several of the little leaves added into the sewn part were not part of the original design. There was a lot of adjustments and patching as seam allowances were turned and little "uh oh" spaces appeared.

We had several beautiful quilts shared in a classroom show & tell session.  This one was particularly awesome - a Baltimore in my color palette! Unfortunately I can't remember the name of the person who made it but she is my hero.  It was gorgeous!



I borrowed this and the following couple of photos from Cynthia's Facebook posts.  Here is our class photo (I'm hiding in the back row as usual). All of the blocks turned out slightly different - it was interesting to see how people changed things up.


We had a lot of time to visit with and learn from the masters during the event. Marylou McDonald presented a lecture on Friday and shared some Baltmore Album history with us. Her quilts were beautiful and very inspiring.



Elly Sienkiewicz joined us for dinner a couple of nights and chatted with us about the book she is trying to work on and other things she would love to accomplish. She is always entertaining!


Above is another picture borrowed from Cynthia - taken after Marylou's program Friday. From left to right: Elly Sienkiewicz, Cynthia Williford and Marylou McDonald. Three icons in the industry!

It was a great week and has inspired a new project...  More to come on that later!

Monday, February 1, 2016

January Progress Report

I've been plugging away at the many quilt-related commitments I made at the beginning of the year and am happy to say that I have made some progress! First up is the APQ UFO Challenge. The UFO chosen for January was #2, which happened to be my Somewhere in Time BOW. I managed to complete the stitching for blocks 1 & 2 and get a little start on block 3. I decided to do mine on a dark background instead of the light one provided and am loving the way the blocks are turning out.  



Next is the Quilty 365 challenge.  I got a bit of a late start on this one as I didn't run across the post until Jan 4. When I saw that some others had adapted the project to orange peels I had to jump in!  I started an orange peel quilt last year and hadn't made a lot of progress. I didn't originally include this one on my UFO list but love the idea of trying to do one a day so I decided to bump another project in favor of playing along. So 31 days in (we'll just say I started at the beginning of the year to keep the math simple) I haven't quite met the goal but I have made more progress in one month than I did all of last year! I hope to be able to meet and maybe surpass my goal in February with all of my travel. See how other challenge participants are progressing on their projects on today's Quilty 365 blog linkup.


I'm still trying to decide what method I prefer for making these.  I prepped the first bunch using the starch method because I was concerned about precise placement. I found I still needed to create a window template to ensure they were in exactly the right place, though.I hate dealing with the points when they are starched - I just don't like the feel of the bulk when you fold that starched flag under. I did the last five or so by needle-turn using my template for placement. It seemed a lot easier - faster prep and no annoying crunch flags to deal with!

Last but not least is the 365 Challenge.  My picture didn't turn out great but I did manage to complete all of the January blocks. I am hoping that all of these different blues play together nicely in the end - a few look a little out of place in the photo. These blocks are a lot of fun though I must say they are getting a little tedious...1.25" half square triangle are pretty darn small to work with!


The APQ UFO Challenge for February is #5 which happens to be my Disappearing Nine Patch. I am excited about that one since I got a bit of a head start on that one in January. I am optimistic I can move it along even though I will be short on machine time this month due to travel  

The sewing room saga continues. I spent all day Saturday trying to unpack and sort things for our guild's yard sale. It is going to take a LONG time before I have everything put away. There is so much stuff! I don't think I ever need to shop again!